FAQs
More FAQs- Are there instructions to follow after my hard-surface floors are cleaned?
- Will the application of urethane disrupt my business?
- What is post construction cleaning?
Before you walk on your floors, it’s best to allow drying time of at least 4 hours but we recommend 8 hours. Be cautious and protect floors from getting wet for 24 hours after application of either finish as it is not yet thoroughly cured. You can return furniture to your floors (with suggested use of felt pads) after 24 hours and return rugs to floors after 24 hours.
The initial application process will require stripping any existing coatings and applying urethane coating plus drying time. This process can be done after hours and will require only daily cleaning for the life of the finish, averaging two years. Because there is no buffing or recoating for that time period, there will be no other disruptions. The reapplication process will not require further stripping.
Construction clean-up is a service provided to brand new buildings or buildings that are being remodeled. While building contractors will do a general clean-up of construction debris, a detailed clean is required to remove all the dust and dirt left behind.